dc.contributor.authorHossain, Md. Motaleb
dc.date.accessioned2016-12-22T17:23:48Z-
dc.date.available2016-12-22T17:23:48Z-
dc.date.issued2011
dc.identifier.issn0972-8791 (Print)
dc.identifier.urihttp://inet.vidyasagar.ac.in:8080/jspui/handle/123456789/827-
dc.description139-148en_US
dc.description.abstractAny complex large scale project consist a lot of activities, so it is very difficult to maintain schedule with standard quality. This paper presents a straight forward method to maintain quality without violating the minimum required time. Firstly, exemplify Critical Path Management (CPM) schedule from the multifaceted project by selecting parallel activities. Secondly, it represents the technique of control project standard by sampling attributes, and finally, compares the testing results by sampling attributes and those of from Normal distribution method.en_US
dc.language.isoen_USen_US
dc.publisherVidyasagar University , Midnapore , West-Bengal , Indiaen_US
dc.relation.ispartofseriesJournal of Physical Science;Vol 15 [2011]
dc.titleA Quality Control Approach Based on CPM Schedulingen_US
dc.typeArticleen_US
Appears in Collections:Journal of Physical Sciences Vol.15 [2011]

Files in This Item:
File Description SizeFormat 
M15Art15.pdf193.17 kBAdobe PDFView/Open


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.